Fossil energy – Tyra II
Yesterday morning the Tyra Redevelopment team at Total welcomed home the first new Tyra II topsides in the Danish North Sea.
[Read more…] about First new Tyra II topsidesGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
Yesterday morning the Tyra Redevelopment team at Total welcomed home the first new Tyra II topsides in the Danish North Sea.
[Read more…] about First new Tyra II topsides
The installation of the world’s largest floating offshore wind farm, the ABS-Classed Kincardine Offshore Wind has been completed.
[Read more…] about World’s largest floating wind farm installed
Just recently the first part of near shore export cable circuit (17.5 km) was installed for the 900 MW Greater Changhua 1 & 2a Offshore Wind Farms!
[Read more…] about Installation of near shore export cable Greater Changhua 1 & 2a OWF
In another pioneering step in the offshore wind industry, DEME installed the first offshore substation (OSS) in France.
[Read more…] about DEME installs first offshore substation at Saint-Nazaire OWF
Vineyard Wind announced that Jan De Nul Group, together with its subcontractor JDR Cable Systems has been selected to supply and install the 130 miles of inter-array cables for the Vineyard Wind 1 project.
[Read more…] about Vineyard selects Jan De Nul for inter-array cable supply and installation
The jacket for the Saint-Nazaire offshore substation has been successfully installed over the weekend.
[Read more…] about Installation of jacket for Saint-Nazaire offshore substation
The Fixed facilities alliance, between Aker BP, Aker Solutions and ABB, has delivered yet another platform on time, with a high level of quality and with no harm to people or the environment.
[Read more…] about Hod B platform safely installed (VIDEO)
Pre-lay trenching works along a number of inter-array cable routes within the Neart Na Gaoithe (NnG) Wind Farm Area are due to start on 7 August 2021.
[Read more…] about Inter-array cable campaign at Neart na Gaoithe OWF
On August 4, the topside of the normally unmanned wellhead platform for the Hod field is transported from Aker Solutions in Verdal to the Aker BP-operated field.
[Read more…] about Record-breaking platform delivered to Hod Field
Van Oord’s Aeolus has resumed drilling work at the Saint-Brieuc wind farm offshore France after the activities were halted once again last week due to the spillage of hydraulic fluid from one of the drills.
[Read more…] about Drilling resumed again at Saint-Brieuc OWF