Wind Energy – Cranage
This weekend, the 1,600mt Huisman Leg Encircling Crane for Fred. Olsen Windcarrier was lifted aboard its vessel Bold Tern through a very spectacular tandem lift by Asian Hercules II and III.
The operations took place at Keppel FELS in Singapore.
The crane was installed as a ‘single lift’, drastically shortening the commissioning and testing scope to just a few weeks. With the new Huisman crane, the lifting capacity of the Bold Tern has doubled, making her ready for installation of the next generation of wind turbines.