Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

1,600mt leg encircling crane for Brave Tern

Monday, April 4 2022

General – LEC

Huisman has announced the award of a contract with Fred. Olsen Windcarrier for delivery of another 1,600mt Leg Encircling Crane (LEC) to be installed on jack-up offshore wind turbine installation vessel Brave Tern.

This order follows the previous order of a 1,600mt LEC in March 2020, as part of the major fleet upgrade programme of Fred. Olsen Windcarrier.

The 1,600mt LEC will be outfitted with a unique 140m boom and has a lifting height of 165m above deck. With its upgraded cranes, the vessels of Fred. Olsen Windcarrier will be capable of installing larger foundations and handling next generation turbines.

Related posts:

  1. Second 1600t crane upgrade ordered
  2. Leg Encircling Crane on its way to Singapore
  3. Leg encircling cranes for Cadeler x-class vessels
  4. Huisman signs again leg encircling crane contract for delivery to Eneti

Filed Under: Brave Tern, crane vessel, Fred Olsen, Huisman, International News, LEC Tagged With: brave tern, Fred Olsen Windcarrier, Huisman


Read Magazine Online


Event List

  • Reuters Events: Global Energy Transition 2022
    • 14/06/2022 - 15/06/2022
  • WindEnergy Hamburg 2022
    • 27/09/2022 - 30/09/2022
  • Offshore Energy Exhibition & Conference 2022
    • 29/11/2022 - 30/11/2022
    • Amsterdam
  • all events

Follow us on Twitter

Tweets door @OERnews

Copyright © Practica Productions - All rights reserved - 2022 cookies