Wind Energy – HKW
Ecowende contracted Van Oord for the construction of the offshore wind farm Hollandse Kust (west) lot VI.
[Read more…] about Ecowende contracts Van Oord to build most ecological wind farm yetGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
Ecowende contracted Van Oord for the construction of the offshore wind farm Hollandse Kust (west) lot VI.
[Read more…] about Ecowende contracts Van Oord to build most ecological wind farm yet
Ecowende and Sif will collaborate on the construction of Ecowende’s offshore wind farm Hollandse Kust West site VI, located about 53 kilometres off the Dutch coast.
[Read more…] about Ecowende and Sif officially join forces to build HKW
Today the ‘sail out’ of the topside for the offshore platform Hollandse Kust (west Alpha) took place from the port of Antwerp.
[Read more…] about TenneT topside ‘west Alpha’ ready for journey to final destination
Excavation work started this week on Velsen beach in the Netherlands to remove seven obstacles from the sand at a depth of several metres.
[Read more…] about TenneT excavates obstacles for construction cable route HKW
Ecowende is going to build the Hollandse Kust West-alfa wind farm in harmony with nature, with minimal impact on birds, bats and marine mammals, and with a thriving underwater world.
[Read more…] about Ecowende to build most nature-friendly wind farm to date
Yesterday the move-out of the topside for second transformer station of a series of 3 substations for TenneT took place in Hoboken, Belgium.
[Read more…] about Topside HKW Alpha left construction hall
Ecowende, a joint venture of Shell and Eneco, is the winner of the permit for the Hollandse Kust (west) Site VI offshore wind farm.
[Read more…] about Shell/Eneco win tender for 756 MW Hollandse Kust (west) Site VI
At the Equans yard in Hoboken, Belgium, the joint venture Equans – Iemants and TenneT started the cutting of the first steel for the topside of the offshore transformer station for the Hollandse Kust (west Beta) wind farm zone.
[Read more…] about Smulders and Equans kick off topside fabrication HKW
The Dutch Sif Group fabricate 4 jackets piles for the Hollandse Kust West Beta substation of TenneT.
[Read more…] about Jacket piles for TenneT’s substation HKW
Jan De Nul Group completed the first part of the cable installation works to connect the wind farms Hollandse Kust (noord) and (west Alpha).
[Read more…] about Connecting HKN and HKW