Wind Energy – Rock Installation
Yesterday, the first load of rocks for the wind farm off the coast of Le Tréport in France was successfully loaded on DEME’s Rollingstone from the REBO terminal.
[Read more…] about Rollingstone loads rocks in OstendGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
Yesterday, the first load of rocks for the wind farm off the coast of Le Tréport in France was successfully loaded on DEME’s Rollingstone from the REBO terminal.
[Read more…] about Rollingstone loads rocks in Ostend
The N-Sea Geo Ranger has started geophysical survey on the Inch Cape Offshore Wind Farm.
[Read more…] about Geophysical survey on Inch Cape OWF
Vaalco Energy has farmed into the CI-705 block offshore Côte d’Ivoire.
[Read more…] about Vaalco becomes operator of Offshore Côte D’Ivoire CI-705 Block
Last week, the Latvian Cabinet of Ministers approved the 200 square kilometre research site for the ELWIND offshore wind park.
[Read more…] about Approval research site for ELWIND offshore wind park
Vår Energi has proven more oil close to the Goliat field in the Barents Sea.
[Read more…] about More oil close to Goliat field in Barents Sea
Kongsberg Maritime will supply the design and integrated equipment package for a new walk-to-work offshore service vessel (OSV), to be built by ST Engineering Marine in Singapore for a leading oil & gas company.
[Read more…] about New OSV order for ST Engineering Marine
Australia’s Offshore Infrastructure Regulator (OIR) has approved the feasibility stage management plan of Blue Mackerel North for the Blue Mackerel project off the coast of Gippsland, Victoria.
[Read more…] about First management plan for offshore wind in Australia
Danish offshore wind installation firm Cadeler has signed a contract to deploy its newbuild offshore wind vessel, the Wind Pace, at an offshore wind farm in the United States.
[Read more…] about Cadeler secures work for Wind Pace in US
Dajin Heavy Industry announced that on February 26, the final 10 monopiles for RWE’s Thor offshore wind project were safely stored at Eemshaven port.
[Read more…] about Final batch of monopiles for RWE’s Thor Project
MODEC has entered into a Front End Engineering and Design (FEED) contract with SAMSUNG E&A for an offshore carbon capture pilot project, selecting Carbon Clean’s modular CycloneCC technology.
[Read more…] about Samsung wins FEED for carbon capture onboard Modec FPSO