Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Another Vessel Reservation Agreement for Havfram

Monday, October 14 2024

Wind Energy – Havfram

Havfram has signed a reservation agreement with an undisclosed client for turbine installation, using one of its newly built jack-up vessels.

[Read more…] about Another Vessel Reservation Agreement for Havfram

Filed Under: Havfram, Installation, installation vessel, International News, turbines Tagged With: Havfram, Installation, turbines

Cadeler signs firm contracts with Equinor and Polenergia

Tuesday, October 1 2024

Wind Energy – Baltic Sea

Cadeler has signed firm contracts with the offshore wind farms Bałtyk 2 and Bałtyk 3, both being joint venture projects owned 50% by Equinor and 50% by Polenergia.

[Read more…] about Cadeler signs firm contracts with Equinor and Polenergia

Filed Under: Baltic Sea, Baltyk OWF, Cadeler, Installation, installation vessel, International News Tagged With: Baltic Sea, Baltyk, Cadeler, Equinor, Polenergia

Boskalis installed Processing Platform topside

Thursday, September 19 2024

Fossil Energy – Installation

Boskalis’ semi-submersible heavy transport vessel Forte installed the Gallaf GE Central Processing Platform (CPP) topside at its final destination, the Al Shaheen field offshore Qatar, according to the company’s release.

[Read more…] about Boskalis installed Processing Platform topside

Filed Under: Boskalis, CPP, Heavy Lift, Installation, International News, Qatar Tagged With: Al Shaheen Field, BosKalis, CPP, engineering, Gallaf, Qatar, topside

Much interest in new foundation installation technology

Sunday, September 8 2024

Wind Energy – Installation Technology

Just recently CAPE Holland welcomed Luxcara, Omexom, JBO | Jörss-Blunck-Ordemann and Heerema Marine Contractors to see the CAPE VLT-640 Triple which is currently stored at Breman Machinery in Genemuiden.

[Read more…] about Much interest in new foundation installation technology

Filed Under: Breman Machinery, CAPE Holland, Installation, International News, Technology, Vibro Lifting Tool, vibro-piling, Vibrojet Tagged With: Breman Machinery, CAPE Holland, installation technology

Installation 80 subsea foundations for Yunlin OWF

Sunday, August 25 2024

Wind Energy – Taiwan

Yunneng Wind Power has announced the successful installation of all 80 subsea foundations for the 640 MW Yunlin Offshore Wind Farm.

[Read more…] about Installation 80 subsea foundations for Yunlin OWF

Filed Under: Foundations, Installation, International projects, Taiwan Tagged With: subsea foundations, taiwan, Yunneng Wind Power

Inter-array cables for Borkum Riffgrund

Tuesday, August 20 2024

Wind Energy – Borkum Riffgrund

Boskalis’ cable-laying vessel BOKA Ocean has set sail for Ørsted’s offshore wind farm Borkum Riffgrund 3 in the German part of the North Sea.

[Read more…] about Inter-array cables for Borkum Riffgrund

Filed Under: Borkum Riffgrund, Boskalis, Installation, inter-array cables, International projects Tagged With: Borkum Riffgrund, BosKalis, inter-array cables

Hua Tian Long en route to Saudi Arabia

Sunday, August 18 2024

Fossil Energy – One-Year Charter

Guangzhou Salvage Middle East FZCO announced that its flagship vessel, the Hua Tian Long, is en route to Saudi Arabia for a one-year charter.

[Read more…] about Hua Tian Long en route to Saudi Arabia

Filed Under: Installation, installation vessel, International News, Saudi Arabia Tagged With: Guangzhou Salvage, Saudi Arabia

SAL signs contract with Van Oord

Tuesday, July 16 2024

Wind Energy – Transport and Installation

SAL Heavy Lift has signed contracts with Van Oord to support the transportation and installation of secondary structures for the Baltica 2.

[Read more…] about SAL signs contract with Van Oord

Filed Under: Baltica 2, Installation, International News, Poland, SAL, Transport & Installation, Van Oord Tagged With: Baltica 2, Poland, SAL Heavy Lift, transport, Van Oord

Integrated Jet Plough on NKT Victoria

Tuesday, July 16 2024

General – Jet Plough

NKT has successfully utilized its new Integrated Jet Plough on NKT Victoria, enabling reliable simultaneous cable laying and burial operations for the 320 kV HVDC power cable system for the BorWin5 offshore grid connection.

[Read more…] about Integrated Jet Plough on NKT Victoria

Filed Under: Borwin5, Installation, International News, NKT Tagged With: BorWin, HVDC cable, Jet Plough, NKT Cables

Ørsted pilots new technology optimising monopile installation

Saturday, July 13 2024

Wind Energy – Monopile Installation

Building on existing marine life protections, Ørsted has developed a new, lower-noise installation method that could potentially revolutionise the way offshore wind foundations are installed.

[Read more…] about Ørsted pilots new technology optimising monopile installation

Filed Under: Gode Wind 3, Innovation, Installation, International News, monopile foundations, Orsted Tagged With: Gode Wind 3, Innovation, lower noise installation, monopile foundations, Orsted

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 9
  • Page 10
  • Page 11
  • Page 12
  • Page 13
  • Interim pages omitted …
  • Page 21
  • Go to Next Page »

All rights reserved - 2026 cookies