Restart
Iraq has restarted the Baiji-Fishkhabour oil pipeline after a 12-year shutdown, initially transporting 120,000 barrels per day (bpd) from the Kirkuk oil field to Turkey’s Mediterranean port of Ceyhan.
The 960-kilometre pipeline, which was shut down in 2014 following attacks by Islamic State militants, has resumed operations after extensive repairs.
The reopening strengthens Iraq’s alternative oil export routes amid disruptions to maritime shipments in the Persian Gulf caused by the US-Iran conflict.
Under a recent agreement, Turkey has committed to transporting up to 750,000 bpd of Iraqi crude, with potential capacity reaching 1.5 million bpd.
Iraq aims to increase flows through the reopened pipeline to 500,000 bpd, although it has not announced a timeline. Industry analysts caution that operational and logistical challenges could limit further expansion.
