Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Jacket for BorWin 6 installed in North Sea

Saturday, March 21 2026

General – Jacket Installation

Heermea’s SSCV Sleipner just installed the TenneT BorWin 6 jacket in the North Sea on behalf of Mc Dermott.

The steel structure, nearly 5,000 mT, is now securely fixed to the seabed with 10 piles, preparing the site for the topside float over later this year.

This campaign was delivered through close cooperation, with all activities planned and executed in line with stringent German offshore regulations, including strict underwater noise limits during piling and specific grouting requirements.

Related posts:

  1. Jacket installed for Hollandse Kust West Beta wind farm
  2. Mammoet signs contract with Heerema Marine Contractors
  3. TenneT awards transport and installation slots to Heerema and Allseas
  4. Heerema to build new float-over barge for TenneT

Filed Under: Heerema, Installation, International News, jacket installation, Tennet Tagged With: heerema, jacket installation, north sea, tennet

All rights reserved - 2026 cookies