General – Dredging
This summer, DEME proudly launched the second phase of capital dredging works in the access channel to the Port of Patimban, Indonesia.

Trailing suction hopper dredger Brabo was mobilized to deepen a 3 km stretch to -14 m below the lowest tide level – bringing the total dredged volume to an impressive 5.5 million m³.
These works follow the successful deepening of the inner basin in 2024 and are carried out in collaboration with the Penta Ocean–Toyo Rinkai–PP–Wika–Jakon consortium.
Patimban, located 145 km east of Jakarta, is set to become one of Indonesia’s largest ports, with a future capacity of 7.5 million TEUs.
