General – Mooring Piles
InterMoor has completed the construction of 12 mooring piles for the Salamanca floating production unit (FPU) located in the U.S. Gulf of Mexico and operated by LLOG Exploration.
The 12 piles, built with over 2,000 tons of steel, are 80’ long and 16’ OD, weighing over 150 tons each.
InterMoor provided the design of the piles from its engineering office in Houston, as well as the steel procurement and fabrication of the piles at its Louisiana facility.
LLOG Exploration Offshore will use the Salamanca floater to develop the Leon and Castile subsea developments in the U.S. Gulf of Mexico.