Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Contract to fabricate 12 mooring piles for InterMoor

Saturday, April 22 2023

Fossil Energy – Mooring Piles

InterMoor was recently awarded a contract to fabricate 12 mooring piles to support project manager LLOG in the permanent mooring of the Salamanca Floating Production System (FPS) offshore Gulf of Mexico (GOM).

LLOG previously awarded the design of the 80’ long and 16’ OD piles, weighing over 150 tons each, to InterMoor in Q4 2022.

The fabrication project builds on InterMoor’s reputation as a premier suction pile fabricator and adds to our extensive track record, which includes the fabrication of the largest foundation pile in the GOM.

The 12 mooring piles will be fabricated at InterMoor’s Morgan City, Louisiana ISO 9001: 2022, ISO 14001 and IS0 40001 certified facility. 

Related posts:

  1. InterMoor awarded FOW engineering design and installation study in Asia
  2. Cable for Hokchi field in GoM
  3. Chevron awards InterMoor decommissioning contract
  4. bp starts oil production at Argos platform in GoM

Filed Under: Gulf of Mexico, InterMoor, International News, mooring piles Tagged With: FPS, GoM, Intermoor, mooring piles

All rights reserved - 2025 cookies