Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Heerema Marine Contractors demonstrates novel RNA method

Thursday, March 30 2023

Wind Energy – Demo RNA Method

HMC has achieved a major milestone in the offshore wind industry by demonstrating the effectiveness and reliability of the floating installation of wind turbines using our novel RNA method.

This achievement is the result of extensive engineering, innovation, and the dedication of the HMC team, along with the client and other supporting parties.

During the three-year preparation period, HMC conducted a significant amount of engineering and testing, including extensive simulations, mock-up testing, and the design of the GREP system.

Related posts:

  1. Heerema breaks lifting record with 17,000 metric tons module
  2. Successful offshore test C1 Wedge Connection  (VIDEO)
  3. Heerema installs first wind turbine using novel RNA method
  4. TenneT awards transport and installation slots to Heerema and Allseas

Filed Under: demonstration, floating installation, Heerema, International News Tagged With: demonstration, floating installation, heerema, RNA Method, wind turbies

All rights reserved - 2025 cookies