Wind Energy – HKW
The Dutch Sif Group fabricate 4 jackets piles for the Hollandse Kust West Beta substation of TenneT.
The jacket piles have a total weight of 900 tons and a length of up to 79 meters.
With a planned total capacity of 700 MW, Hollandse Kust West Beta will be able to support 700,000 Dutch households with green energy every year – straight from the Dutch ocean.