Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Mammoet selected to supply onshore heavy lifting and transport for Dogger Bank

Tuesday, November 22 2022

Wind Energy – Dogger Bank

GE Renewable Energy announced today that it has selected Mammoet UK to supply onshore heavy lifting and transport for the staging and assembly of turbine components for Dogger Bank Wind Farm.

Dogger Bank Wind Farm is a joint venture between SSE Renewables, Equinor and Vårgrønn.

Mammoet will employ multiple lifting and transport crews for simultaneous operations to support with the loading of equipment and tower assembly in the marshalling harbour, a key piece in constructing the project. The team will utilize cranes and self-propelled modular transporter (SPMT) axles at Able Seaton Port, the Dogger Bank Wind Farm marshalling harbour.

GE will start preparing the marshalling harbour and receiving components at the end of 2022.

Related posts:

  1. United Heavy Transport opens doors for business
  2. DEME Offshore secures another sizable inter-array cable contract for Dogger Bank
  3. Largest ever CPS contract for Tekmar
  4. Construction monitoring role on Dogger Bank C for K2

Filed Under: Dogger Bank, GE, Heavy Lift, International News, Mammoet, Transport Tagged With: Dogger Bank, GE Renewable Energy, mammoet


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • FOWT 2023
    • 10/05/2023 - 12/05/2023
  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies