Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Mammoet selected to supply onshore heavy lifting and transport for Dogger Bank

Tuesday, November 22 2022

Wind Energy – Dogger Bank

GE Renewable Energy announced today that it has selected Mammoet UK to supply onshore heavy lifting and transport for the staging and assembly of turbine components for Dogger Bank Wind Farm.

Dogger Bank Wind Farm is a joint venture between SSE Renewables, Equinor and Vårgrønn.

Mammoet will employ multiple lifting and transport crews for simultaneous operations to support with the loading of equipment and tower assembly in the marshalling harbour, a key piece in constructing the project. The team will utilize cranes and self-propelled modular transporter (SPMT) axles at Able Seaton Port, the Dogger Bank Wind Farm marshalling harbour.

GE will start preparing the marshalling harbour and receiving components at the end of 2022.

Related posts:

  1. New Project Director for Dogger Bank Wind Farm
  2. Edda Wind launches CTV for Dogger Bank Wind Farm
  3. Certex wins contract on world’s largest offshore windfarm
  4. Double naming ceremony North Star

Filed Under: Dogger Bank, GE, Heavy Lift, International News, Mammoet, Transport Tagged With: Dogger Bank, GE Renewable Energy, mammoet

All rights reserved - 2025 cookies