Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Final Tyra II structures installed

Monday, October 10 2022

Fossil Energy – Tyra II

Heerema’s Sleipnir successfully installed the final Tyra II structures this weekend!

On behalf of TotalEnergies and Danish Underground Consortium Partners, Heerema Marine Contractors installed two bridges and a flare tower.

Both bridges were over 85-meters, and were installed using both cranes in a dual-crane lift

The installed flare tower is 170-meters above sea level.

Now that all eight platforms, six bridges, two jackets, and the flare are in position, and after the Heerema team finished the completion activities, the company concluded its scope on Tyra II!

Related posts:

  1. First new Tyra II topsides
  2. Heerema’s Sleipnir installs first Tyra topsides
  3. Sleipner installed three Tyra topsides (VIDEO)
  4. Heerema breaks lifting record with 17,000 metric tons module

Filed Under: bridge, flare tower, Heerema, Installation, International News, TotalEnergies, Tyra Tagged With: heerema, Sleipnir, TotalEnergies, Tyra II


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • FOWT 2023
    • 10/05/2023 - 12/05/2023
  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies