Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Two final modules on Johan Castberg (VIDEO)

Monday, September 5 2022

Fossil Energy – Johan Castberg

Equinor reported that last week the world’s largest crane heavy lift vessel, Sleipnir, was quayside at Stord, installing the two final modules on the Johan Castberg floating production, storage and offloading ship.

With the modules for the turret in place, the FPSO is complete.

Now all modules will be inter-connected and everything tested, a comprehensive job to be completed in 2024.

Related posts:

  1. Equinor’s giant new FPSO Johan Castberg reaches Norway (VIDEO)
  2. Sleipnir breaks records on Johan Sverdrup Phase 2 development project
  3. Integration lifts for Johan Sverdrup P2 topside (VIDEO)
  4. Heerema to kick off Dunlin decommissioning

Filed Under: Equinor, FPSO, Heavy Lift, Heerema, International News, Johan Castberg, Sleipnir Tagged With: Equinor, FPSO, heerema, Johan Castberg, Sleipnir


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • Suriname, Energy, Oil & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies