Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ARCHIVE
    • Printed Issues Offshore Magazine
    • Downloads
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Online OER Magazine
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Approval for North Sea Snorre gas import line

Tuesday, August 2 2022

Fossil Energy

Equinor has approval from Norway’s Petroleum Safety Authority (PSA) for temporary use of the Snorre gas import pipeline in the northern Norwegian North Sea.

This is part of the Snorre Gas Import System sub-project under the Snorre Expansion Project for the Snorre Field in the Tampen area, in 300 m to 350 m water depth.

Production from the field started in 1992. The plan for development and operation of the Snorre Expansion Project was approved in 2018. This is a subsea tieback to the Snorre A TLP, comprising six subsea templates, each with four wells.

Related posts:

  1. Wind turbines for Hywind Tampen floating wind farm (VIDEO)
  2. Adjusted assembly plan for final four Hywind Tampen turbines
  3. Aker Solutions delivers Njord A platform
  4. Hammerfest LNG to resume operations in a week

Filed Under: Equinor, International News, Pipeline, Snorre Tagged With: Equinor, norway, pipeline, snorre


Read Magazine Online



Wind and Fossil Info



Event List


  • OTC Houston
    • 01/05/2023 - 04/05/2023
  • FOWT 2023
    • 10/05/2023 - 12/05/2023
  • 3rd Suriname Energy, Oil & Summit & Exhibition
    • 19/06/2023 - 22/06/2023
  • Offshore Europe Aberdeen
    • 05/09/2023 - 08/09/2023
  • Offshore Energy Exhibition & Conference 2023
    • 28/11/2023 - 29/11/2023
    • Amsterdam
  • all events

Copyright © Practica Productions - All rights reserved - 2023 cookies