Wind Energy – Hai Long
Hai Long Offshore Wind, CSBC-DEME Wind Engineering Co. (CDWE), Century Iron & Steel Industrial Co. (CIS), and Century Wind Power Co. (CWP) had an ECA signing ceremony in Taipei on March 28th, where Hai Long announced that CIS and CWP have been selected by CDWE as the preferred suppliers for the jacket foundations.

In 2024, CIS and CWP will supply 21 three-legged jacket foundations to Hai Long 2A project, which is bound by localization requirements.