Recently the 1st load-out of the Concrete Work Platforms (CWPs) for the Dutch Wind farm Fryslân took place at the certified precast concrete element factory of Aarsleff BIZ in Poland. [Read more…] about CWPs on their way to IJsselmeer in Holland (VIDEO)
Wind farm Fryslân starts construction with first MP installation
On September 7, 2020, the construction of Windpark Fryslân started with the piling of the first of the 89 foundation piles in the bottom of the Ijsselmeer in the Netherlands. [Read more…] about Wind farm Fryslân starts construction with first MP installation