Wind Energy – Dogger Bank
Jan De Nul Group’s newest jack-up installation vessel Voltaire recently installed her very first offshore wind turbine at Dogger Bank.
[Read more…] about Voltaire installs first wind turbines at Dogger BankGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
Jan De Nul Group’s newest jack-up installation vessel Voltaire recently installed her very first offshore wind turbine at Dogger Bank.
[Read more…] about Voltaire installs first wind turbines at Dogger Bank
Seagreen Wind Farm, a joint venture between SSE Renewables and TotalEnergies, achieved another landmark this week as the 114th and final wind turbine was installed.

Seagreen is Scotland’s largest offshore wind farm and is located 27km from the Angus coast.
Once fully operational, Seagreen will be capable of generating around 5,000GWh of renewable energy annually – enough clean and sustainable electricity to power more than 1.6m UK homes.
This morning, the Wind Orca completed the installation of the final offshore wind turbine at the Seagreen Wind Farm.
[Read more…] about Wind Orca completed installation wind turbines at Seagreen Wind Farm
Cadeler has signed a contract with Siemens Gamesa to install 26 wind turbines at the Aflandshage offshore wind farm south of Copenhagen in 2026.
[Read more…] about Installation of turbines at Aflandshage wind farm in Denmark
Ørsted has appointed Havfram Wind to install turbines at its Hornsea 3 offshore windfarm, starting autumn 2026.
[Read more…] about Havfram Wind to install turbines Hornsea 3
Siemens Gamesa has installed the first of the three 115-metre blades on the SG 14-236 DD offshore wind turbine prototype at the Danish national test center for large wind turbines in Østerild.
[Read more…] about First 115-metre blade on Sg 14-236 Dd OWT prototype installed