Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

NKT signs EUR 1 billion supply agreement with Hydro

Tuesday, April 29 2025

General – Supply Agreement

NKT has signed a landmark supply agreement with Hydro to secure a long-term supply of low-carbon aluminium wire rod through to 2033.

[Read more…] about NKT signs EUR 1 billion supply agreement with Hydro

Filed Under: aluminium wire rod, Hydro, International News, Low carbon, NKT Tagged With: hydro, long term supply, low carbon wire rod, NKT

Installing of 255 km power cables offshore Norway

Thursday, March 13 2025

Fossil Energy – Power Cables

NKT’s cable-laying vessel, NKT Victoria, has successfully completed the first installation campaign in the Norwegian fjords and in the North Sea, connecting the Yggdrasil offshore oil and gas area to shore.

[Read more…] about Installing of 255 km power cables offshore Norway

Filed Under: Installation, installation vessel, International News, NKT, Norway, power cable, power cable vessel, Yggdrasil Tagged With: Installation, NKT, norway, power cable, Yggdrasil field

NKT completes rapid repair of BritNed interconnector

Thursday, February 20 2025

General – Interconnector Repair

NKT and BritNed have repaired the BritNed interconnector after a power outage, ensuring minimal downtime of the 450 kV high-voltage DC power cable between Great Britain and the Netherlands.

[Read more…] about NKT completes rapid repair of BritNed interconnector

Filed Under: BritNed, Interconnector, International projects, NKT, Repair Tagged With: BritNed, interconnector, NKT, repair

Keel laying ceremony for NKT Eleonora cable-laying vessel

Thursday, January 16 2025

General – Newbuilding

NKT has completed the ceremonial keel laying for NKT Eleonora. The new cable-laying vessel is a key element for NKT in strengthening its installation capacity and capabilities to meet the growing demand for offshore power cables.

[Read more…] about Keel laying ceremony for NKT Eleonora cable-laying vessel

Filed Under: Cable installation, cable installation vessel, International News, Newbuilding, NKT, VARD Tagged With: cable installation, newbuidling, NKT, Vard

NKT awarded two high-voltage projects

Friday, December 27 2024

General – Energy Transition

TenneT, the Dutch-German transmission system operator, has selected NKT to provide 525 kV XLPE high-voltage direct current (HVDC) on- and offshore power cable systems for two projects under the existing framework agreement.

[Read more…] about NKT awarded two high-voltage projects

Filed Under: HVDC, infrastructure, International projects, LanWin, NKT, power cable, Tennet Tagged With: hvdc, LanWin 7, NKT, NordOstLink, power cable systems, tennet

NKT Eleonora capable of running on methanol

Tuesday, November 12 2024

General – Cable Installation

With the recent steel-cutting milestone, NKT is one step closer to introducing the NKT Eleonora.

[Read more…] about NKT Eleonora capable of running on methanol

Filed Under: Cable installation, cable installation vessel, Engineering, International News, NKT, steel cutting Tagged With: cable installation, engineering, Newbuilding, NKT, steel cutting

New cable laying vessel capable of running on methanol

Tuesday, June 25 2024

Wind Energy – Cable Installation

Building upon the strong operational experience and cutting-edge technology featured on NKT Victoria, the new cable laying vessel NKT Eleonora will represent the next generation of cable laying vessels in in terms of both design and capabilities.

[Read more…] about New cable laying vessel capable of running on methanol

Filed Under: Cable installation, cable installation vessel, Cable-laying vessel, Cables, International News, NKT Tagged With: cable installation, NKT

Export cable for BorWin 5

Monday, June 3 2024

Wind Energy – Export Cable

NKT is preparing for the installation of the export power cable for the BorWin5 offshore grid connection.

[Read more…] about Export cable for BorWin 5

Filed Under: Borwin5, Export cable, International projects, NKT Tagged With: BorWin5, Export Cable, NKT

NKT completes inspection survey on interconnector

Tuesday, May 14 2024

General – Survey Work

NKT has completed inspection survey and remediation work on the East West interconnector that links Ireland and Great Britain.

[Read more…] about NKT completes inspection survey on interconnector

Filed Under: Interconnector, International News, NKT, survey, survey vessel Tagged With: East West interconnector, inspection survey, interconnector, NKT

HVDC power cable Dogger Bank A (VIDEO)

Thursday, October 26 2023

Wind Energy – HVDC Power Cable

NKT has successfully produced and installed the turnkey 320 kV HVDC power cable system project for offshore wind park Dogger Bank A.

[Read more…] about HVDC power cable Dogger Bank A (VIDEO)

Filed Under: Dogger Bank, HVDC, International News, NKT Tagged With: Dogger Bank, HVDC cable, NKT

  • Page 1
  • Page 2
  • Go to Next Page »

All rights reserved - 2025 cookies