Wind Energy – Transport and Installation
SAL Heavy Lift has signed contracts with Van Oord to support the transportation and installation of secondary structures for the Baltica 2.
[Read more…] about SAL signs contract with Van OordGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
SAL Heavy Lift has signed contracts with Van Oord to support the transportation and installation of secondary structures for the Baltica 2.
[Read more…] about SAL signs contract with Van Oord
NKT has successfully utilized its new Integrated Jet Plough on NKT Victoria, enabling reliable simultaneous cable laying and burial operations for the 320 kV HVDC power cable system for the BorWin5 offshore grid connection.
[Read more…] about Integrated Jet Plough on NKT Victoria
Blackfish Engineering, a UK-based engineering firm specializing in sustainable energy design and development, recently unveiled a mooring system that could be a game-changer for numerous floating offshore renewable technologies.
[Read more…] about Quick connection system for floating structures
OEG Energy Group announced that OEG Renewables business Bluestream Offshore has been awarded a large remedial campaign by Vattenfall and Stadtwerke München on the DanTysk and Sandbank offshore wind farms.
[Read more…] about Bluestream awarded remedial campaign on two offshore wind farms
One of the largest floating offshore wind projects in the world has taken a step closer to becoming a reality with the submission of the consent application to the Scottish Government.
[Read more…] about Ossian floating wind farm submits consent application
TenneT is pleased to join the International Responsible Business Agreement for the Renewable Energy Sector.
[Read more…] about International Responsible Business Agreement
DEME’s Viking Neptun, the DP3 Offshore Construction and Cable Installation vessel has just completed its 10-year class survey at Orskov Yard.
[Read more…] about Overhauling Viking Neptun’s 400-ton offshore crane
Building on existing marine life protections, Ørsted has developed a new, lower-noise installation method that could potentially revolutionise the way offshore wind foundations are installed.
[Read more…] about Ørsted pilots new technology optimising monopile installation
Allseas recently announced the safe removal of Shell UK’s 31,000-tonne Brent Charlie platform topsides from the UK sector of the North Sea.
[Read more…] about Allseas removes final Brent platform
Commercial terms have been established with The Crown Estate in the UK to enable Dogger Bank D to progress, under an amendment to the existing seabed lease, subject to the outcome of a ‘Plan-Level Habitats Regulations Assessment’ (HRA).
[Read more…] about Fourth phase world’s largest OWF Dogger Bank