Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

International projects, strategies and politics

Contract extension for Eidesvik Offshore with Aker BP

Friday, February 27 2026

Milaha is strengthening its maritime position

Friday, February 27 2026

Deep Value Driller decides not to finalize agreement with Saipem

Thursday, February 26 2026

Seawind Asia secures grid connection agreements in Philippines

Wednesday, February 25 2026

Novastar Energy secures contract for Poland’s Baltica 2 OWP

Wednesday, February 25 2026

More International Projects.....

Latest News......

TKF officially opens innovative factory for subsea cables

Monday, September 23 2024

General – Opening

TKF’s new factory in Eemshaven, where the production of inter-array subsea cables for offshore wind farms takes place, was officially opened on September 19.

[Read more…] about TKF officially opens innovative factory for subsea cables

IRO and Navingo renew cooperation agreement

Sunday, September 22 2024

General – Exhibition and Conference

IRO and Navingo have renewed their long-running cooperation agreement for the Offshore Energy Exhibition and Conference in Amsterdam.

[Read more…] about IRO and Navingo renew cooperation agreement

TechnipFMC secures contracts at Petrobras’ Brazil fields

Saturday, September 21 2024

Fossil Energy – Subsea Contracts

Oilfield services company TechnipFMC has been awarded two multi-million-dollar subsea contracts by Petrobras for the pre-salt fields offshore Brazil.

[Read more…] about TechnipFMC secures contracts at Petrobras’ Brazil fields

Boskalis installed Processing Platform topside

Thursday, September 19 2024

Fossil Energy – Installation

Boskalis’ semi-submersible heavy transport vessel Forte installed the Gallaf GE Central Processing Platform (CPP) topside at its final destination, the Al Shaheen field offshore Qatar, according to the company’s release.

[Read more…] about Boskalis installed Processing Platform topside

Dual loading on Viking Neptun

Thursday, September 19 2024

Wind Energy – Dual Loading

Earlier this week DEME successfully completed dual loading on both existing and new 8000T carousel onboard the Viking Neptun.

[Read more…] about Dual loading on Viking Neptun

Two new center column designs

Thursday, September 19 2024

Wind Energy – Floating Wind

Principle Power has unveiled two new semisubmersible floating wind foundation designs: the WindFloat TC (tubular, center column) and WindFloat FC (flat-panel, center column).

[Read more…] about Two new center column designs

Installation of TCP Jumper

Thursday, September 19 2024

Fossil Energy – TCP Jumper Technology

Earlier this week Strohm’s TCP Jumper technology has been successfully fitted at the Deepwater Sabah project.

[Read more…] about Installation of TCP Jumper

Beam boosts fleet with two Explorer ASVs and Quantum EV ROV

Thursday, September 19 2024

General – ASVs and ROV

Beam, a company created by the recent merger of Rovco and Vaarst, has strengthened its fleet with two new autonomous surface vessels (ASVs), called Xplorers, and a Quantum EV workclass remotely operated vehicle (ROV).

[Read more…] about Beam boosts fleet with two Explorer ASVs and Quantum EV ROV

Oil and gas discovery in North Sea

Thursday, September 19 2024

Fossil Energy – Discovery

Equinor and its partners have made an oil and gas discovery in wildcat wells 15/3-13 S and 15/3-13 A on the Gudrun field in the North Sea.

[Read more…] about Oil and gas discovery in North Sea

Johan Castberg anchored on the field

Thursday, September 19 2024

Fossil Energy – Barents Sea

The floating production, storage and offloading vessel (FPSO) is now securely anchored on the Johan Castberg field in the Barents Sea.

[Read more…] about Johan Castberg anchored on the field
  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 128
  • Page 129
  • Page 130
  • Page 131
  • Page 132
  • Interim pages omitted …
  • Page 357
  • Go to Next Page »

More articles...


  • Accommodation/hull installation at Merwede Yard
  • New well stimulation vessel for CNOOC
  • Turbine supply agreement for Vanguard West OWF
  • Hellenic Cables to supply inter-array cables for the BC-Wind OWP
  • First monopiles and transition pieces for Nordlicht I
  • High-grading DOF’s AHTS fleet through vessel transactions
  • BigLift marks milestone with launch of first BC-Class vessel
  • Haskoning to design OWFs in Estonia and Latvia
  • TenneT initiates search for new CEO
  • TPAO signs deal with Shell for oil & gas search off Bulgaria

All rights reserved - 2026 cookies