Fossil Energy – Errea Wittu
Seatrium, based in Singapore, has secured a topsides integration contract for FPSO Errea Wittu from Offshore Frontier Solutions, a MODEC Group company.
[Read more…] about FPSO topside contract for SeatriumGLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES
Seatrium, based in Singapore, has secured a topsides integration contract for FPSO Errea Wittu from Offshore Frontier Solutions, a MODEC Group company.
[Read more…] about FPSO topside contract for Seatrium
Italian engineering firm Rosetti Marino has completed the construction of the jacket and topside for the Fenix wellhead platform, which are now headed to Tierra del Fuego in southern Argentina.
[Read more…] about Jacket and topside leaving Rosetti yard to reach offshore Argentina
Aker Solutions has been awarded a limited notice to proceed contract from Vattenfall for the Norfolk Vanguard West Offshore Wind Farm off the coast of Norfolk, UK.
[Read more…] about Aker Solutions gets Norfolk wind go-ahead
Today the ‘sail out’ of the topside for the offshore platform Hollandse Kust (west Alpha) took place from the port of Antwerp.
[Read more…] about TenneT topside ‘west Alpha’ ready for journey to final destination
Subsea7 has successfully completed the sail away and offshore installation of the topsides unit of the bp operated Azeri Central East (ACE) platform in Azerbaijan.
[Read more…] about Subsea7 completed sail away ACE platform
The topsides unit of the Azeri-Central-East (ACE) platform loaded onto the STB-1 barge has been sailed away from the Bayil fabrication yard in Baku where it was built.
[Read more…] about ACE topsides sailing to Caspian Sea installation site
Baltic Eagle´s offshore substation topside (OSS) has been successfully installed.
[Read more…] about The (Baltic) Eagle has landed (VIDEO)
At the Equans yard in Hoboken, Belgium, the joint venture Equans – Iemants and TenneT started the cutting of the first steel for the topside of the offshore transformer station for the Hollandse Kust (west Beta) wind farm zone.
[Read more…] about Smulders and Equans kick off topside fabrication HKW
Installation vessel Orion of DEME Offshore has successfully installed the topside for the offshore transformer station Hollandse Kust (north).
[Read more…] about Topside Hollandse Kust (north) successfully installed on jacket