General – Newbuilding
Huisman has signed a contract with VARD for the delivery of a 250mt knuckle boom crane, which will be installed on a newbuild offshore construction vessel for Dong Fang Offshore (DFO).

The vessel is currently under construction at VARD and is destined for operations in the Taiwanese offshore wind market.
The crane features a lifting capacity of 250mt and is equipped with a below-deck winch. This below-deck configuration reduces maintenance requirements and ensures easy accessibility for servicing.