Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

IWS Seawalker arrived in Hanstholm

Tuesday, October 29 2024

General – IWS Seawalker

Last night, Integrated Wind Solutions’ NB no 3, arrived in the Port of Hanstholm, Denmark.

[Read more…] about IWS Seawalker arrived in Hanstholm

Filed Under: Denmark, Dogger Bank, Integrated Wind Solutions, International News Tagged With: Denmark, Dogger Bank, Integrated Wind Solutions, IWS Seawalker

Grid connection agreement South Korea

Tuesday, October 29 2024

General – Grid Connection

Corio Generation’s BadaEnergy portfolio – a joint venture with TotalEnergies and SK ecoplant – recently signed a grid connection agreement with Korea Electric Power Corporation (KEPCO).

[Read more…] about Grid connection agreement South Korea

Filed Under: agreement, Corio, International News, KEPCO Tagged With: Agreement, Corio Generation, grid connection, KEPCO

OMS signs contract for cable-laying vessels with Royal IHC

Monday, October 28 2024

General – Cable Laying Vessels

OMS Group, a KKR-backed Malaysian subsea digital infrastructure company, has signed a contract with Dutch maritime firm Royal IHC for the construction of a series of cable-laying vessels.

[Read more…] about OMS signs contract for cable-laying vessels with Royal IHC

Filed Under: Cable installation, cable installation vessel, International News, OMS, Royal IHC Tagged With: cable laying vessels, OMS, Royal IHC

Geotechnical survey platform G-STAR

Monday, October 28 2024

General – South Korea

Last week Geoview Korea hosted the official opening ceremony for its new geotechnical survey platform, G-STAR.

[Read more…] about Geotechnical survey platform G-STAR

Filed Under: G Star, geotechnical engineering, International News, South Korea, survey, survey platform Tagged With: G-Star, Geoview, South Korea, survey platform

Monopile and transition piece installation Vineyard Wind 1

Sunday, October 27 2024

Wind Energy – Vineyard Wind USA

On or about October 28, 2024, the vessel ORION will begin installing the remaining Monopile Foundations (MPs) within the Vineyard Wind 1 Wind Development Area (WDA).

[Read more…] about Monopile and transition piece installation Vineyard Wind 1

Filed Under: DEME, Installation, installation vessel, International News, monopiles, transition pieces, Vineyard Wind Tagged With: deme, Installation, Monopiles, transition pieces, Vineyard Wind 1

Extension long-term contract REYM/NAM

Saturday, October 26 2024

Fossil Energy – Industrial Cleaning

REYM has reached an agreement with NAM Assen to extend our long-term contract.

[Read more…] about Extension long-term contract REYM/NAM

Filed Under: Contract extension, International News, NAM, service agreement Tagged With: Contract extension, NAM, REYM, service provider

IRO members vote unanimously in favour of merging with NMT

Friday, October 25 2024

General – Merger

Yesterday afternoon at the General Assembly, all IRO members unanimously voted positively to merge with NMT!

[Read more…] about IRO members vote unanimously in favour of merging with NMT

Filed Under: International News, Merger Tagged With: iro, merger, NMT

OEEC 2024: A lot to talk about

Friday, October 25 2024

General – Events

In a little more than five years, renewable energy targets set for 2030 will come knocking on the door. Whether they will be reached, missed or overshot, depends on multiple factors, most of which concern policymakers and the energy sector itself.

[Read more…] about OEEC 2024: A lot to talk about

Filed Under: Amsterdam, Events, International News, OEEC Tagged With: Amsterdam, Events, floating wind, hydrogen, OEEC, Politics, wind energy

No recorded collisions between floating offshore wind turbine and birds

Friday, October 25 2024

Wind Energy – METCentre Norway

For more than two years, the floating offshore wind turbine TetraSpar at METCentre off the coast of Norway has been monitored by a bird camera: no collisions have been recorded.

[Read more…] about No recorded collisions between floating offshore wind turbine and birds

Filed Under: Floating wind, International News, METCentre, Norway Tagged With: birds, collisions, floating wind, METCentre, norway, turbines

DEME awarded inter-array cable and secondary steel contract for Oranjewind OWF

Thursday, October 24 2024

Wind Energy – Contracts for DEME

DEME has been awarded a contract to carry out the transport and installation works for the inter-array cables and secondary steel for the Dutch OranjeWind offshore wind farm.

[Read more…] about DEME awarded inter-array cable and secondary steel contract for Oranjewind OWF

Filed Under: DEME, inter array cables, International News, OranjeWind, RWE, secondary steel structures, TotalEnergies Tagged With: deme, inter-array cables, north sea, Oranjewind OWF, RWE, secondary steel, TotalEnergies

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 124
  • Page 125
  • Page 126
  • Page 127
  • Page 128
  • Interim pages omitted …
  • Page 359
  • Go to Next Page »

All rights reserved - 2026 cookies