Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • MUST READ ARTICLES
  • CONTACT

BP moves Indonesia CCUS Project into offshore installation phase

Monday, July 27 2026

Platform Jacket

BP has advanced the Tangguh Ubadari, CCUS and Compression (UCC) project in Indonesia with the first offshore platform jacket arriving in Fakfak, Papua Barat.

The arrival marks the start of the offshore installation phase.

The jacket completed a 5,800-km journey from the Karimun fabrication yard after more than 357,600 work hours, BP said.

The company said the arrival of the approximately 994-tonne structure paves the way for installation activities offshore, with the next phase involving the laying of 75 km of pipeline connecting the platform to the Tangguh LNG facilities.

The Tangguh UCC project comprises development of the Ubadari gas field, onshore compression facilities and a carbon capture, utilizations and storage (CCUS) system.

BP said the project is expected to unlock around 3 trillion cubic feet of additional gas resources while incorporating Indonesia’s first large-scale CCUS development.

The initial phase of the CCUS project is expected to have the capacity to permanently store about 15 million tonnes of carbon dioxide captured from Tangguh LNG operations.

Related posts:

  1. ACE platform jacket ready for load-out
  2. Saipem awarded offshore EPCI contract by bp in Indonesia
  3. Saipem completes installation production platform Neptun Deep
  4. Enbridge to build pipelines for GOM deepwater oil project

Filed Under: BP, CCUS, compression, Indonesia, International News, Jacket, jacket installation Tagged With: BP, CCUS and Compression project, Fakfak, Indonesia, jacket, Oil and Gas, Tangguh UCC, Ubadari Gas Field

All rights reserved - 2026 cookies