Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • MUST READ ARTICLES
  • CONTACT

Flintstone starts rock installation at Dogger Bank C

Wednesday, July 22 2026

Scour Protection

According to the Notice to Mariners, the DEME fall pipe vessel Flintstone will start rock installation work at Dogger Bank C.

This is the third phase of the 3.6 GW Dogger Bank Wind Farm, owned by SSE Renewables, Equinor, and Vårgrønn.

The recently refurbished vessel will supply, transport, and install scour protection at various locations on Dogger Bank C, starting operations on 23 July and finishing its scope around 10 August.

Related posts:

  1. Rollingstone loads rocks in Ostend
  2. Viking Neptun ready for cable installation Dogger Bank C
  3. DEME awarded T&I contract for Formosa 4 OWF
  4. Joint venture DEME/Boskalis starts installing rocks for Equinor

Filed Under: DEME, Dogger Bank C, International News, rock installation, Scour protection Tagged With: deme, Dogger Bank C, Flinstone, rock installation, rock installation vessel, scour protection

All rights reserved - 2026 cookies