Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • MUST READ ARTICLES
  • CONTACT

All subsea structures are now in place at Skarv

Thursday, July 9 2026

Christmas Trees

Aker BP announed that all six vertical Christmas trees have now been installed as part of the Skarv Satellite Project (SSP).

This equipment is placed on top of a well to control the safe flow of oil and gas.

With this installation, all subsea structures are now in place. This was the final piece of the subsea scope.

The SSP development includes the gas and condensate discoveries Alve Nord, Idun Nord, and Ørn. Together, they are being brought closer to production, step by step.

Related posts:

  1. Advanced subsea operation without sending personnel offshore
  2. Aker BP gets board approval for $19bn investment
  3. Delineation of discovery in Norwegian Sea (6507/2-7 S)
  4. Aker Solutions earns Aker BP M&M extension

Filed Under: Aker BP, christmas trees, International News, Skarv field, subsea production, subsea production system Tagged With: Aker BP, Christmas trees, Oil and Gas, Skarv, subsea structures

All rights reserved - 2026 cookies