Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

First steel cut for LanWin2 Project  

Tuesday, September 30 2025

General – Steel Cutting

Dragados Offshore announced the start of the steel blocks fabrication at its subcontractors facilities: Cimolai in Italy and Eversandai in UAE.

The first steel-cutting ceremonies took place successfully at both sites, being the trigger of a new phase in the execution of the 2GW HVDC Offshore Platform for TenneT Germany’s offshore grid connection LanWin2.

This milestone represents another step forward and reinforces DragadosOffshore’s commitment and collaboration with partner SiemensEnergy, with the European Energy Transition and with client TenneT.

Related posts:

  1. KCI wins contract to design 2 HVDC converter platforms
  2. Start construction first 2GW direct current offshore platform
  3. NKT awarded two high-voltage projects
  4. Converter station BorWin5 departed from Dragados

Filed Under: Dragados, HVDC, HVDC Converter station, International News, LanWin, Siemens Energy, steel cutting, Tennet Tagged With: Dragados Offshore, grid connection, hvdc, LanWin2, offshore platform, SiemensEnergy, steel cutting, tennet

All rights reserved - 2025 cookies