Fossil Energy – Marjan Field
Aramco announced a milestone in the Marjan Gas Lift Project — the successful installation of the first-ever slipover jacket.

The technically demanding offshore operation was completed in 50 meters of water.
This achievement was delivered through a meticulously planned, together with the Saipem 3000.
The project took over 2 years of engineering and design, followed by 1.5 years of fabrication and readiness.
