Fossil Energy – Congo
BOURBON announces the signing of a five-year contract with Eni Congo to renew its crew boat fleet.

This contract represents a strategic milestone in further reducing emissions related to offshore personnel transport.
It covers the charter of six new, latest-generation S200X-G2 units, scheduled to be commissioned progressively between June and December 2026.
Developed to meet Eni’s operational and environmental requirements, this new serie is based on the successful design of Surfers 200x-G delivered in 2024 presenting significant fuel savings in transit estimated at 20% versus previous generation, thanks to an optimized hydrodynamic design and propulsion system, and the integration of a real-time energy performance monitoring system (EFMS) tailored to the vessel and built-in during construction.
