Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Aker Solutions secures contract for Fram Sør tie-in project

Thursday, July 10 2025

Fossil Energy – Subsea tie-in

Aker Solutions has been awarded a contract by Equinor to prepare the topside of Troll C to receive and process the production from the Fram Sør subsea tie-in project. 

Photo of Troll C platform. Photo: Equinor.

Fram Sør will be developed as a subsea tie-in to Troll C and will utilize the existing processing capacity on the platform. The area is located 20 km north of the Troll C platform. 

The tieback requires modifications to the topside of the Troll C platform. The scope includes engineering, procurement, construction, installation, and commissioning (EPCIC), as well as services for the new subsea templates.

Aker Solutions has carried out the front-end engineering and design (FEED) for the project, led by its office in Bergen.

Project management, detailed engineering, procurement, and shop engineering will be managed by the Bergen and Mumbai offices. Fabrication will occur at the company’s yard in Egersund.

The project will commence right away, with production scheduled to start at the end of 2029.

Related posts:

  1. EPCIC contract to modify Troll A
  2. Aker Solutions wins contract for Norwegian Sea tie-back job
  3. Second phase Northern Lights carbon storage project
  4. McDermott advances Scarborough EPCIC with FPU floatover

Filed Under: Aker Solutions, Engineering, EPCIC, Fram Sør, International News, tie-in, Troll Tagged With: Aker Solutions, engineer, EPCIC, Fram Sør, tie-in project, Troll C

All rights reserved - 2025 cookies