Fossil Energy – Pipeline Installation
Allseas’ Solitaire has completed pipelay duties for Equinor and Aker BP Yggdrasil development – delivering 122 kilometres of oil and gas export pipelines.
From touchdown monitoring to tight ‘snake curves’, Solitaire executed the full offshore scope solo, installing an in-line tee at the edge of her tensioner geometric limits and laying more than 86.000 tonnes of steel and concrete on the seabed with pinpoint precision.
All supported by seamless pipe supply logistics from shore to ship.