Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Metrology and Hydraulic System for Fengmiao 1 OWF

Tuesday, May 13 2025

Wind Energy – PPT

Seatools from the Netherlands has been awarded a contract by CSBC-DEME Wind Engineering (CDWE) for the design, engineering, and delivery of the metrology and control system for the Pre-Piling Template (PPT) at the Fengmiao 1 Offshore Wind Farm in Taiwan.

The Fengmiao 1 wind farm will feature jacket-type foundations installed using pre-installed pin piles. Seatools’ metrology and control system will be integrated into CDWE’s piling template to ensure accurate positioning of piles within tight tolerances—an essential element for successful jacket installation.

Engineering activities for the system are already underway and will continue in close collaboration with CDWE.

Related posts:

  1. DEME secures installation contract for Fengmiao 1 OWF
  2. All pin piles installed on Hai Long
  3. CDWE selected Seatools for another project offshore Taiwan
  4. First wind turbine successfully installed for Hai Long!

Filed Under: CDWE, CSBC-DEME, DEME, Fengmiao, International projects, Pin piles, PPT, Taiwan Tagged With: CDWE, deme, Fengmiao 1, pin piles, PPT, taiwan

All rights reserved - 2025 cookies