Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Nexans secures contract for Malta-Sicily second interconnector

Wednesday, April 30 2025

General – Interconnector

Nexans has been awarded a significant contract by Interconnect Malta (ICM) to deliver the second Malta-Sicily interconnector.

This new high-voltage alternating current (HVAC) link will reinforce Malta’s electricity system, ensuring a stable and resilient energy supply. The cables for this project will be produced at Nexans’ facility in Charleston, USA.

The 225 MW interconnector will operate at 220 kV and consists of a subsea cable linking Maghtab, Malta, and Ragusa, Sicily. It will be installed in parallel with the existing interconnector, which Nexans previously delivered.

Related posts:

  1. Nexans makes game-changing step connecting French and Irish grids
  2. Nexans wins record-breaking contract EuroAsia Interconnector
  3. Nexans secures contract for Gotland electricity connection project
  4. Walberswick announced preferred landfall location LionLink

Filed Under: HVAC, Interconnector, International projects, Malta, Nexans Tagged With: HVAC Cable, ICM, interconnector, Malta, Nexans

All rights reserved - 2025 cookies