Fossil Energy – Increase in Supply
Eni and Petroci have announced a significant increase in gas supply for Côte d’Ivoire’s power generation system.
Launched in December 2024 on schedule and with full safety measures, Phase 2 of the Baleine project marks another step forward in the company’s commitment to strengthening the country’s energy sector and industrial development, significantly strengthening access to energy.
The gas produced – up to 70 million cubic feet per day – will be allocated to meet local demand, ensuring a reliable supply for the country’s power generation needs and further reinforcing Côte d’Ivoire’s role as a regional energy hub.
This achievement has been made possible through close collaboration with Ivorian authorities and Petroci, leveraging Eni’s integrated approach that combines responsible production with a positive impact on local communities.
At the same time, Eni has reached its oil production plateau of 60,000 barrels per day, tripling output compared to the 20,000 barrels produced in the previous phase.