Wind Energy – Survey
The N-Sea Geo Ranger has started geophysical survey on the Inch Cape Offshore Wind Farm.

The vessel is the first of a total of 7 N-Sea vessels to perform route clearance and cable installation works in 2025 and 2026.
The combination of N-Sea’s capabilities reduces the interfaces between the various cable related scopes.