Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Geophysical survey on Inch Cape OWF

Monday, March 3 2025

Wind Energy – Survey

The N-Sea Geo Ranger has started geophysical survey on the Inch Cape Offshore Wind Farm.

Photo credit: Wouter Van Beek.

The vessel is the first of a total of 7 N-Sea vessels to perform route clearance and cable installation works in 2025 and 2026.

The combination of N-Sea’s capabilities reduces the interfaces between the various cable related scopes.

Related posts:

  1. N-Sea Group closes acquisition of Geo Plus
  2. Fleet expansion N-Sea with hybrid survey and ROV support vessel
  3. NKT completes inspection survey on interconnector
  4. Shearwater GeoServices to perform two consecutive projects in Asia Pacific

Filed Under: Geophysical, Inch Cape, International News, survey, survey vessel Tagged With: Inch Cape Offshore, N-Sea, survey activities

All rights reserved - 2025 cookies