Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

NKT completes rapid repair of BritNed interconnector

Thursday, February 20 2025

General – Interconnector Repair

NKT and BritNed have repaired the BritNed interconnector after a power outage, ensuring minimal downtime of the 450 kV high-voltage DC power cable between Great Britain and the Netherlands.

The fault, which was localised onshore in the Netherlands, was swiftly addressed by NKT and the BritNed repair team, ensuring a quick return to service.

NKT undertook the cut and seal operation of the broken cable as well as provided essential calculations and technical support to BritNed. A new section of the mass-impregnated cable was installed and jointed within less than 20 days after the fault had happened.

Related posts:

  1. NKT completes inspection survey on interconnector
  2. World’s longest electricity interconnector
  3. Export cable for BorWin 5
  4. LionLink developed through offshore grid project Nederwiek 3

Filed Under: BritNed, Interconnector, International projects, NKT, Repair Tagged With: BritNed, interconnector, NKT, repair

All rights reserved - 2025 cookies