Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

Fabrication starts on deep water GoM Trion platform

Friday, November 15 2024

General – First Steel FPU

The HD Hyundai Heavy Industries (HHI) yard in Ulsan, South Korea, has cut first steel for Woodside Energy’s Trion semisubmersible floating production unit (FPU).

This will be the first deepwater oil production platform to operate offshore Mexico, and it is in 2,500 m water depth and 180 km from the coast.

Woodside awarded HHI the engineering, procurement and construction contract in June 2023. Currently, the Trion development (a joint venture with Pemex – 40%) is more than 15% complete, with the first oil targeted in 2008.

HHI says it will build the entire Trion FPU, including the topside and hull, and plans to set sail for Mexico in the first half of 2027.

The Trion development is a joint venture between Woodside (60%) and Pemex (40%).

Related posts:

  1. HD Korea secures $1.19bn contract to build offshore facility
  2. TechnipFMC awarded contract by Woodside for Julimar Phase 3 Development
  3. TechnipFMC secures contract to manufacture flexible pipe
  4. Woodside awards shore base contract Trion project in Mexico

Filed Under: FPU, HHI, International projects, Woodside Energy Tagged With: first steel, FPU, HHI, mexico, South Korea, Woodside Energy

All rights reserved - 2025 cookies