Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

TenneT launches offshore cable survey tender

Saturday, October 19 2024

Wind Energy – Cable Survey Tender

TenneT has opened an application period for a EUR 3 million tender for surveys of cables installed in the Dutch sector of the North Sea.

Work will start in 2025 and will be performed on the export cables at the Borssele and the Hollandse Kust offshore wind farm zones and the Cobra and NorNed interconnectors.

TenneT has divided the three operations and maintenance (O&M) survey areas into separate lots but applicants can submit proposals for multiple lots.

The deadline for requests to participate in the tender is 9 December 2024.

The scope of work includes multibeam echosounder (MBES), side-scan sonar (SSS) and airborne surveys or surveys using other solutions to cover landing/tidal areas following set technical specifications.

The contracts also include establishing the bathymetry and topography of the seabed and its features to identify the obstructions in the corridor and any possible cable exposures or free spans.

Related posts:

  1. RWE wins bid confirms Federal Network Agency
  2. TenneT announces large scale HVDC cable tender for offshore grid
  3. Petrobras looks to add up to eight floating rigs next year
  4. Tender for a 700 MW offshore wind park off Lithuania

Filed Under: cable survey, Export cable, Interconnector, International projects, Tenders, Tennet Tagged With: cable survey, export cables, Interconnectors, north sea, tender, tennet

All rights reserved - 2025 cookies