Wind Energy – Transport and Installation
SAL Heavy Lift has signed contracts with Van Oord to support the transportation and installation of secondary structures for the Baltica 2.
Baltica 2 is one of two stages of the Baltica Offshore Wind Farm developed by PGE Polska Grupa Energetyczna and Ørsted in Poland.
Two weeks ago, the SAL team met with Van Oord representatives at its Hamburg office to finalize this significant collaboration.