Wind Energy – Revolution in Rope Industry
Neil Schulz, Global Sales Director for Renewable Energy, Lankhorst Offshore announced on social media that the results of the tests with the first Terminator sample, are excellent.
This new termination will revolutionise the rope industry and offshore mooring systems for floating wind turbines.
Connecting hardware will no longer be required as direct connection to chain will be possible resulting in significant cost savings for our clients.