Wind Energy – CSOV
Gondan Shipbuilders has completed and handed over the Sudri Enabler, the fourth in a series of six Commissioning Service Operation Vessels (CSOVs) for Edda Wind.
The vessel, designed by Salt Ship Design, has a length of 88.3 metres, a beam of 19.7 metres, and is equipped with zero-emission technology.
According to Edda Wind, the CSOV, which can accommodate 120 people, will now depart for Plymouth, where the vessel will pick up clients and other additional personnel before continuing to the Dogger Bank Wind Farm for operation.