Ocean Energy Resources

GLOBAL NEWS SERVICE FOR THE FOSSIL AND RENEWABLE ENERGY COMMUNITIES

  • HOME
  • ADVERTISE WITH US
  • FREE SUBSCRIPTIONS
    • Digital Newsletter
  • MUST READ ARTICLES
  • CONTACT

New cable laying vessel capable of running on methanol

Tuesday, June 25 2024

Wind Energy – Cable Installation

Building upon the strong operational experience and cutting-edge technology featured on NKT Victoria, the new cable laying vessel NKT Eleonora will represent the next generation of cable laying vessels in in terms of both design and capabilities.

Courtesy: NKT.

Notably, it will be one of the world’s first cable laying vessels designed to be able to run on methanol.

Equipped with three turntables, NKT Eleonora will offer a power cable laying capacity in excess of 23,000 tonnes, and host a large range of subsea tooling for precise installation and service of offshore cables. The vessel will be capable of laying three power cables, so it can fulfil evolving customer requirements, especially on large-scale 525 kV projects where metallic return cables are required. 

Related posts:

  1. Nexans to build third generation cable laying vessel
  2. DEME Offshore secures first cable contract for offshore wind farm in Poland
  3. Jan De Nul picks MacArtney’s CEMAC tensioners for CLV Fleet
  4. Installation of Hollandse Kust (west Beta) export cables

Filed Under: Cable installation, cable installation vessel, Cable-laying vessel, Cables, International News, NKT Tagged With: cable installation, NKT

All rights reserved - 2025 cookies