Fossil Energy – Troll Gas Field
OneSubsea, a joint venture between SLB, Aker Solutions and Subsea 7, has secured a contract from Equinor for work at Troll gas field in the North Sea.
The contract is for Phase 3, Stage 2 of Equinor’s North Sea Troll Project, which is in line for over $1.1 billion infrastructure investment announced by Norway’s energy giant with project partners earlier on May 24, 2024.
To accelerate field delivery of the subsea tieback to existing infrastructure, SLB OneSubsea will leverage configurable solutions compliant with NCS2017+ for standardized subsea production systems for application in the Norwegian Continental Shelf (NCS).
The objective for Troll Phase 3, Stage 2 is to accelerate production from the reservoir equivalent to about 55 billion standard cubic meters of gas.
The expanded scope includes nine standard NCS2017+ vertical trees including wellheads, tubing hangers, subsea control modules, compact bridge modules with wet gas flow meters, two 4-slot templates, topside controls integration, and two umbilicals.