Wind Energy – Windanker Baltic Sea
Havfram has signed a contract with Iberdrola for the installation of 21 Siemens Gamesa wind turbines at their Windanker project in the Baltic Sea.
The agreement covers transport and installation support, which will be executed by one of Havfram’s newbuild NG20000X-HF wind turbine installation vessels.
The contract will start in the summer of 2026 and makes a perfect fit towards high utilization for the vessel planned to be used.
Martin Degen, Commercial Director and Vice President of Havfram, described the relationship as follows: “The entire procurement process with Iberdrola was pragmatic and uncomplicated as both organizations share rigorous standards for quality and sustainability. To be selected as T&I partner for Windanker, Iberdrola’s third Baltic Sea project, proves our established position in the market and that we, at Havfram, are trusted to carry out installations in the crucial end phase before the wind farm goes into operation. The project adds to our strong and growing contract backlog.”