Fossil Energy – Topside Delivery
Merely two days after the successful lift of the upperpart of the jacket on its lower counterpart, HSM Offshore Energy has successfully rolled out the N05-A Topside for ONE-Dyas at its yard in Schiedam, the Netherlands.
Once completed the N05-A Platform will be the first electrified gas production platform in the North Sea, which will run entirely on offshore renewable energy from the nearby Riffgat Offshore Wind Farm.
With cutting-edge technology and innovative design, this topside is a new era to HSM Offshore Energy’s commitment to accelerate local Dutch gas production and proves its leading role in the offshore energy transition.