Wind Energy – Lithuania
Wood Thilsted announced the commencement of ground modelling and foundation concept design work at the first offshore wind farm site in Lithuania, on behalf of Ignitis Renewables.
The work will take place over 2024 and consist of the development of a site ground model, support to the geotechnical campaign and a variety of foundation concept assessment activities including structural design, corrosion protection and geotechnical interpretation.
Vanrisch McLean, Geophysics and Survey Director at Wood Thilsted said: “Our team is able to extract maximum value from the acquired site survey data by matching our deep geophysical and geotechnical knowledge with our extensive record of foundation design.”